Staff were manually curtailing the facility’s electric load, which regularly exceeds 10MW, in response to peak predictions that were unreliable. Moreover, as a thermally driven manufacturer whose equipment couldn’t be turned off and on quickly, curtailment was especially cumbersome. It was a lot of effort, and a significant opportunity cost, if a peak didn’t occur.