In the 50-plus years since it was founded, Gap Inc. has grown from a simple retail jeans store into four multi-billion dollar brands with a global ambition to champion equality, inclusivity, and sustainability. As part of its sustainability commitment, Gap Inc. has set a goal to reach 100% renewable energy across its global owned and operated facilities by 2030.
The company’s Fresno Distribution Center, in California, figures prominently in its sustainability plans. Gap Inc. originally installed 1MW of solar at the facility in 2008 and then, a decade later, signed a power purchase agreement to develop another 3MW of solar on adjacent land.
True to its innovative spirit, Gap Inc. was also an early adopter of energy storage. Since 2018, Stem’s Athena® software has operated the Fresno Distribution Center’s energy storage system. Stem is now installing a 3.8MWh system at Gap Inc. facility in Ontario, Canada that will deliver significant utility bill savings with no upfront costs.
Stem’s best-in-class Athena software optimizes the Fresno Distribution Center’s battery storage system to provide automated, set-and-forget utility bill savings via demand charge management and energy arbitrage. Meanwhile, Stem’s design and deployment experts are ensuring the Ontario system will deliver maximum savings over its 15-year lifetime. Having experienced success with storage, Gap Inc. is now looking at how new solar plus storage projects can contribute to achieving its sustainability goals.