• Solutions
    • PowerBidder Pro
    • PowerTrack
    • PowerTrack APM
  • Services
  • Case Studies
  • About
    • About Stem
    • Leadership
    • Environmental, Social, Governance
    • Careers
    • Contact Us
    • Modern Slavery Statement
  • Resources
    • Newsroom
    • Press Releases (investors.stem.com)
    • Events
    • Webinars
    • Blog
    • Library
  • Investors
  • Contact
Search
START TYPING AND PRESS ENTER TO SEARCH
  • Solutions
    • PowerBidder Pro
    • PowerTrack
    • PowerTrack APM
  • Services
  • Case Studies
  • About
    • About Stem
    • Leadership
    • Environmental, Social, Governance
    • Careers
    • Contact Us
    • Modern Slavery Statement
  • Resources
    • Newsroom
    • Press Releases (investors.stem.com)
    • Events
    • Webinars
    • Blog
    • Library
  • Investors
  • Contact
Search

CASE STUDY​

Utility-scale Storage Developer

Location

Eastern Texas

Wholesale Market

ERCOT

Stem Service Date

2021-2024

Services

Performance Engineering

Performance Reporting

Storage Project Size

100 MW / 2 hour

Scope

State of Charge Balancing

LFP Block Calibration

Energy Management System Reevaluations

ESREDP Recalculations

Bolstering technical asset management with Stem’s Performance Engineering & Reporting Services

The Utility-scale Storage Developer behind a 100 MW / 2-hour storage project in ERCOT was eager to get to the bottom of why their Energy Storage Resource Energy Deployment Performance (ESREDP) calculation was showing more non-compliance than expected. With years of development history and a diversified portfolio including 10 GW in development across 25+ U.S. states and Canadian provinces, this Developer knew it needed a data-based approach to leveraging deeper expertise in technical asset management.

Stem’s energy experts played a pivotal role in providing expert solutions and services in the successful completion of this storage project analysis. Using a consultative approach for Performance Engineering & Reporting, Stem investigated key areas before offering critical feedback for the Developer – including the tracked dispatch signals along with additional aggregate dispatch and automatic signals to get an accurate cumulative signal from the qualified scheduling entity. We then aligned dispatch with actual power flow at the point of interconnection to identify any mismatch events. Lastly, we dug down to the unit level to find that some units had reached their state of charge power derate level earlier than expected.

DOWNLOAD CASE STUDY
Whitepaper_Icon (1)

Challenge

The conclusion of Stem’s initial data-driven investigation of why their ESREDP calculation showed more non-compliance than expected was due to two main reasons. The unbalanced DC blocks were reporting an incorrect state of charge leading to the rapid derating of discharge power available when unbalanced strings were dropping offline due to low state of charge. Also, the plant was unable to meet the power levels requested by dispatch, which lead to unwanted ERCOT charges and the potential of the plant’s derating due to this shortfall. Knowing that rebalancing costs money and induces more cyclic aging, Stem worked with the Developer to identify the best solutions.

Solution

Using Stem’s proprietary analytics software, Stem’s experts were able to qualify and quantify problems to implement key solutions. First, we reevaluated and upgraded passive and active balancing routines. Second, we confirmed that the calibration for LFP blocks was being performed as intended. Third, we recalculated the actual power available in the energy management system. Fourth, we tracked and tested to ensure balancing and power availability calculations were happening correctly. And fifth, we worked with the EMS provider to optimize the dispatch signals distribution for participating units.

LightningBolt_Icon Copy (1)

Results

Stem’s data-driven approach to our Performance Engineering & Reporting Services resulted in numerous immediate improvements for the Developer including improved ESREDP calculations, improved state of charge balancing, and reduced ‘offline’ balancing or plant wide catch-up balancing. We acted as the force multiplier to the Developer’s asset management team by bolstering more technical expertise for the long-term success of their project. Operational since Summer 2021, the project is currently one of the largest operational standalone lithium-ion battery energy storage projects in Texas and contributes to grid reliability by providing Ancillary Services, ECRS, FFR and energy in the Day-Ahead and Real-Time markets.

Gustavo Monteiro

Chief Executive Officer, EDPR NA DG

“This solar + storage project is a prime example of how MEC - and cooperatives in general - have the power to provide equitable access to clean energy for its members and communities all while providing the framework for a more resilient grid. EDPR NA DG’s collaboration with Stem assured the energy storage system would be optimally configured to supply an end-to-end solution to MEC in our first project together.”

Related Case Studies

Family-owned Storage Developer

Western Texas | 50 MW

Read More

Distributed Generation Storage Developer

Southern Texas | Two 10 MW / 39.16 MWh

Read More

Santa Rosa Junior College

Santa Rosa, CA | 1.3MW plus 2.6MW solar PV

Read More

Let's talk.

Contact the experts at Stem and learn how to simplify your clean energy management.

Stem Headquarters:
Four Embarcadero Center, Suite 710
San Francisco, CA 94111

For Support or Sales
inquiries, call 877-374-7836(STEM).

Linkedin-in
Copyright © 2025 Stem, Inc.
Privacy Policy | Terms of Use

Solutions

  • PowerBidder Pro
  • PowerTrack
  • PowerTrack APM

Services

About

  • About Stem
  • Leadership
  • Environmental, Social, Governance
  • Careers
  • Contact Us
  • Modern Slavery Statement

Resources

  • Case Studies
  • Newsroom
  • Events
  • Webinars
  • Blog
  • Library

If you have a Showpad login for Stem University
Access Stem University Here

If you do not have a Showpad login for Stem University
Register Here