• Solutions
    • PowerBidder Pro
    • PowerTrack
    • PowerTrack APM
  • Services
  • Case Studies
  • About
    • About Stem
    • Leadership
    • Environmental, Social, Governance
    • Careers
    • Contact Us
    • Modern Slavery Statement
  • Resources
    • Newsroom
    • Press Releases (investors.stem.com)
    • Events
    • Webinars
    • Blog
    • Library
  • Investors
  • Contact
Search
START TYPING AND PRESS ENTER TO SEARCH
  • Solutions
    • PowerBidder Pro
    • PowerTrack
    • PowerTrack APM
  • Services
  • Case Studies
  • About
    • About Stem
    • Leadership
    • Environmental, Social, Governance
    • Careers
    • Contact Us
    • Modern Slavery Statement
  • Resources
    • Newsroom
    • Press Releases (investors.stem.com)
    • Events
    • Webinars
    • Blog
    • Library
  • Investors
  • Contact
Search

CASE STUDY​

EDPR NA Distributed Generation

Location

Arizona

Commercial Operational Date

2023

Facility Type

Electric Cooperative

Energy Storage System Size

15 MW / 60 MWh plus 23.27 MW solar PV

Solutions

Solar Plus Storage, Renewable Energy Integration, 24/7 Monitoring, Solar Forecasting, and Advanced Modeling via Athena®

Site Peak Energy Consumption

40% Reduction​

Game-changing Solar + Storage for Electric Cooperatives

EDPR NA Distributed Generation (EDPR NA DG), a U.S. leader in the distributed generation sector and the distributed business unit of EDP Renewables North America, announced a 23.27 MWdc ground-mount solar system coupled with a 15 MW / 60 MWh energy storage system for Mohave Electric Cooperative (MEC), a not-for-profit distribution cooperative in Arizona. This solar + storage system is a game-changer for the region as it will help MEC provide renewable power, mitigate peak period energy use, and ultimately, stabilize energy costs for its 36,700 members.

EDPR NA DG chose Stem to partner on MEC’s first solar + storage project to ensure not only the successful implementation of renewables and batteries but also its ongoing optimization and performance enhancement. Strategically integrated with the renewable energy resource and MEC’s grid control systems, Stem’s Athena® will help the co-op deliver reliable, clean electricity to its members. MEC will use Athena to operate and monitor the storage system 24/7, schedule dispatches, and dispatch on command into high-demand time periods. In addition, MEC will use Athena’s PowerTrack solar management application for AI-driven solar forecasting, and advanced modeling to help streamline solar optimization for added value for MEC and its members.

DOWNLOAD CASE STUDY
Whitepaper_Icon (1)

Challenge

MEC sought to increase its share of renewable energy resources and enhance energy demand balancing, especially during peak summer months. The cooperative aimed to create an adaptive energy infrastructure, reduce operational energy expenses, enhance system resilience, and contribute to sustainability and environmental goals.

Solution

EDPR NA DG, Stem, and others collaborated to customize a cutting-edge ground-mount solar + storage system with a four-hour battery to mitigate peak energy usage and reduce energy costs.

Stem will help ensure:

  • 24/7 Operation and Monitoring: Athena provides continuous oversight to ensure optimal capacity
  • Dispatch and On-Command Scheduling: Through Athena, the utility can effectively schedule the energy storage system for dispatches. This enables precise management of energy flow, ensuring that stored energy is deployed when needed most.
  • Solar Forecasting and Optimization: Athena’s PowerTrack application provides advanced solar forecasting capabilities to predict solar energy production accurately, enhancing overall energy system efficiency.

LightningBolt_Icon Copy (1)

Results

The solar + storage system will help MEC provide renewable power, mitigate peak period energy use, and ultimately, stabilize energy costs for its members. Expected offsets include 36,247 metric tons of carbon dioxide, which is the equivalent of carbon emissions from 7,053 homes’ electricity use in one year or the carbon sequestered by 43,225 acres of U.S. forests in one year.

The project is also expected to provide surrounding residents and local governments in Arizona with new potential sources of revenue from the economic growth, job creation, and workforce development opportunities that come with increased reliability for the area.

Gustavo Monteiro

Chief Executive Officer, EDPR NA DG

“This solar + storage project is a prime example of how MEC - and cooperatives in general - have the power to provide equitable access to clean energy for its members and communities all while providing the framework for a more resilient grid. EDPR NA DG’s collaboration with Stem assured the energy storage system would be optimally configured to supply an end-to-end solution to MEC in our first project together.”

Related Case Studies

Ameresco

Glenwood Springs, CO | 5MW / 15MWh plus 5MW solar PV

Read More

Santa Rosa Junior College

Santa Rosa, CA | 1.3MW plus 2.6MW solar PV

Read More

Let's talk.

Contact the experts at Stem and learn how to simplify your clean energy management.

Stem Headquarters:
Four Embarcadero Center, Suite 710
San Francisco, CA 94111

For Support or Sales
inquiries, call 877-374-7836(STEM).

Linkedin-in
Copyright © 2025 Stem, Inc.
Privacy Policy | Terms of Use

Solutions

  • PowerBidder Pro
  • PowerTrack
  • PowerTrack APM

Services

About

  • About Stem
  • Leadership
  • Environmental, Social, Governance
  • Careers
  • Contact Us
  • Modern Slavery Statement

Resources

  • Case Studies
  • Newsroom
  • Events
  • Webinars
  • Blog
  • Library

If you have a Showpad login for Stem University
Access Stem University Here

If you do not have a Showpad login for Stem University
Register Here