Installation overview

By | February 10, 2014

From start to savings

Stem works closely with you to schedule convenient installation and survey times.

This list provides an initial understanding of the basic requirements necessary for a Stem installation to take place.

[use_case]

* The electrical usage data includes 15-minute interval data not typically provided in your monthly bills. Stem will provide information on how to obtain authorization from your utility to view this data.

Installation timing

The system is installed in one to two days during off-peak times by a licensed electrician and requires no down-time or disruption to your business.

Post-installation

Once the inspections are complete and the utility has provided permission to operate, the Stem system will be interconnected and will begin operating.

Stem will send you your login information for PowerScope.