The Bipartisan Infrastructure Law (BIL) establishes a National Electric Vehicle Infrastructure (NEVI) Program to provide $5 billion over 5 years in funding to states to strategically deploy electric vehicle (EV) charging infrastructure and to establish an interconnected network to facilitate data collection, access, and reliability.
Stem’s eMobility solutions can help partners and customers plan for EV charging along federally-designated Alternative Fuel Corridors (AFC) for charging infrastructure every 50 miles. Stem helps partners and end users take advantage of incentives for electrifying fleets and gain value by generating economic, environmental, and resilience benefits. Our experts help navigate State-specific requirements and more! Fill out the form to connect with a Stem expert today.
Stem and our EV partners have the expertise to help you navigate each state’s complex application process and help you secure NEVI funding. Plus, Stem’s fully integrated, interoperable eMobility solution – where our Athena platform learns from and dictates EV charging behaviors, in addition to optimizing and controlling batteries and solar PV – allows customers to capture and maximize all EV-related value streams, both now and over the long lives of these projects. And because interoperability can’t be guaranteed for future retrofits, co-deploying renewables and storage up front is an option many customers should consider.
Partnering with Stem and adding storage to your NEVI site will help you:
Charge your EVs with locally stored energy from the sun anytime, day or night
Utilize clean energy microgrids so your EVs can charge even during power outages
Leverage solar and storage to expedite EV charging project deployments
Reduce utility bill impacts onsite with Stem’s energy optimization platform
Charge your EVs with locally stored energy from the sun anytime, day or night
Utilize clean energy microgrids so your EVs can charge even during power outages
Leverage solar and storage to expedite EV charging project deployments
Reduce utility bill impacts onsite with Stem’s energy optimization platform
Featured Case Study: Manufacturing Facility
Facing ever-rising energy costs and a limited ability to control them, a Fortune 500 building materials manufacturer contacted Stem about installing battery energy storage at an Ontario facility. Stem supported their application for Ontario’s Global Adjustment program with project lifecycle support – including system procurement, permitting and interconnection advising, operations and maintenance reporting, program enrollment and incentive management.
Read MoreSystem Size:
5.3MW / 8.5MWh
1-year Savings:
$1.6M CAD